论文标题

基于混合模拟的RCC路面项目的基于混合模拟的资源计划和可构建性分析

Hybrid Simulation-based Resource Planning and Constructability Analysis of RCC Pavement Projects

论文作者

Shakerian, Mohammad, Rajabi, Mohammad Sadra, Tajik, Mohammad, Taghaddos, Hosein

论文摘要

基础设施结构中的关键挑战之一是设计和计划操作及其相关资源。不同因素和影响资源生产力的变量的复杂相互联系的组成使模拟成为了运营计划的强大方法。最近,建筑部门在应用各种模拟工具方面有了显着的激增,以进一步提高项目规划的质量,尤其是在大型基础设施发展中(例如,高速公路建设)。由于资源分配不当的成本可能超支,因此必须优化大型标题(例如大规模路面项目)的设计和施工计划阶段。最近的研究旨在通过结合各种模拟方法(例如,离散事件模拟,系统动力学,基于代理的仿真和混合模拟)来建立基于模拟的策略,以增强计划阶段。本文介绍了一种不断发展的实时混合模拟技术,涉及这些项目内在的时间变化的输入和因素,以优化辊压缩混凝土(RCC)路面项目的计划。使用各种资源组合研究了几种方案,以实现为项目传递具体的最佳执行方法。实际的高速公路项目案例研究验证了所提出的模型及其在未来项目中的应用。这项研究结果表明,在时间和成本限制及其相关法规之内,基于模拟的方法在RCC路面项目的资源计划中的熟练程度。

One of the critical challenges in infrastructural constructions is designing and planning operations and their related resources. The complex interlinked composition of different factors and variables affecting resource productivity has made simulation a powerful approach for operational planning. The construction sector has recently seen a notable surge in applying various simulation tools to enhance further the quality of projects planning, particularly in large-scale infrastructure developments (e.g., highway construction). Due to possible cost overruns in improper resource allocation, optimizing the design and construction planning stages of megaprojects such as massive pavement projects is essential. Recent studies aimed to build a simulation-based strategy in construction designing and planning by combining various simulation approaches (e.g., discrete-event simulation, system dynamics, agent-based simulation, and hybrid simulation) to enhance the planning phase. This paper introduces an evolving real-time hybrid simulation technique regarding the projects intrinsic time-varying inputs and factors to optimize the planning of Roller Compacted Concrete (RCC) pavement projects. Several scenarios are investigated using various resource combinations to achieve the best execution method for delivering concrete to the project. An actual highway project case study validates the proposed model and its application for future projects. This studys findings exhibit the proficiencies of the simulation-based approach in resource planning of RCC pavement projects within the time and cost constraints and their related regulations.

扫码加入交流群

加入微信交流群

微信交流群二维码

扫码加入学术交流群,获取更多资源