论文标题
在风隧道中实施高级风力涡轮机控制器,用于缩放涡轮测试
Implementation of Advanced Wind Turbine Controllers for Scaled Turbine Testing in a Wind Tunnel
论文作者
论文摘要
基于在风洞中运行的缩放风力涡轮机上测试高级控制器的一系列实验活动,该贡献描述了整体实验方法,面临的挑战,经验教训以及未来工作的机会。这两个广告系列在2018年秋季和2019年秋季进行,分别使用了即将到来的风的预览扰动测量值测试了不受限制和约束的最佳刀片螺距控制器。具体而言,第一项研究考虑了对线性季度调节器的扩展,以包括馈电作用,而第二次部署的模型预测控制将执行器约束纳入最佳控制问题。活动的结果已经在技术会议和有关控制系统的期刊论文中发表;但是,这些作品中未包括有关如何实施控制器的详细信息。我们的目标是通过这一贡献来填补这一空白,这是针对风能界的。我们描述了实验设置的几个方面,特别是提供了用于控制器的软件和硬件的详细信息;分享有关困难的程序的几个方面的见解,以及我们如何克服这些挑战;并总结基于模拟的研究和物理测试之间的关键差异。通过这样做,我们希望分享我们在实验活动中学到的知识,并为其他希望对风隧道中运行的风力涡轮机进行实验的其他人提供参考。
Based on a series of two experimental campaigns testing advanced controllers on a scaled wind turbine operating in a wind tunnel, this contribution describes the overall experimental method, challenges faced, lessons learned, and opportunities for future work. The two campaigns, run in Fall 2018 and Fall 2019, tested unconstrained and constrained optimal blade pitch controllers, respectively, using preview disturbance measurements of the oncoming wind. Specifically, the first study considered an extension to the linear-quadratic regulator to include feedforward action, while the second deployed model predictive control to incorporate actuator constraints into the optimal control problem. The results of the campaigns have already been published in technical conference and journal papers on control systems; however, detail on how the controllers were implemented was not included in those works. We aim to fill that gap with this contribution, which is targeted at the wind energy community. We describe several aspects of the experimental setup, in particular providing details of the software and hardware used for the controller; share insight on several aspects of the procedure that were difficult and how we overcame those challenges; and summarize the key differences between simulation-based studies and physical testing. By doing so, we hope to share what we learned during our experimental campaigns and provide a point of reference for others looking to carry out experiments on scaled wind turbines operating in wind tunnel facilities.