论文标题

需求收费下的延期负载调度:一种模型预测的控制方法

Deferrable Load Scheduling under Demand Charge: A Block Model-Predictive Control Approach

论文作者

Yang, Lei, Geng, Xinbo, Guan, Xiaohong, Tong, Lang

论文摘要

最佳的延迟电气负载可以重塑汇总负载曲线,以实现更高的操作效率和可靠性。本文研究了根据需求费的延期延期负载计划,该计划在计费期内对高峰消费施加了罚款。当需求预测不准确时,这种终端成本在实时调度中构成了挑战。通过将需求费用分为一系列阶段成本,提出了模型预测的控制方法。充电电动汽车的问题用于说明拟议方法的功效。数值示例表明,在各种设置中,块模型预测性控制优于基准方法。

Optimal scheduling of deferrable electrical loads can reshape the aggregated load profile to achieve higher operational efficiency and reliability. This paper studies deferrable load scheduling under demand charge that imposes a penalty on the peak consumption over a billing period. Such a terminal cost poses challenges in real-time dispatch when demand forecasts are inaccurate. A block model-predictive control approach is proposed by breaking demand charge into a sequence of stage costs. The problem of charging electric vehicles is used to illustrate the efficacy of the proposed approach. Numerical examples show that the block model-predictive control outperforms benchmark methods in various settings.

扫码加入交流群

加入微信交流群

微信交流群二维码

扫码加入学术交流群,获取更多资源