ISO INTERNATIONAL STANDARD 8311 Second edition 2013-12-01 Refrigerated hydrocarbon and non- petroleum based liquefied gaseous fuels Calibration of membrane tanks and independent prismatic tanks in ships Manual and internal electro- optical distance-ranging methods Hydrocarbures refrigerés et combustibles gazeux liquéfies a base non pétroliere-Etalonnage des réservoirs a membrane et réservoirs pyramidaux - Méthodes manuelles et par mesurage électro-optique interne de la distance Reference number IS0 8311:2013(E) LSO @ IS0 2013 licensefrom IHS Not for Resale IS0 8311:2013(E) COPYRIGHTPROTECTEDDOCUMENT @ISO2013 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form written permission. Permission can be requested from either ISO at the address below or ISO's member body in the country of the requester. ISO copyright office Case postale 56:CH-1211 Geneva 20 Tel. + 41 22 749 01 11 Fax +4122 749 09 47 E-mail copyright@iso.org Web www.iso.org Published in Switzerland @ IS0 2013 - All rights reserved No reproductic Not for Resale IS0 8311:2013(E) Contents Page Foreword ..iv Introduction. ..V 1 Scope. ..1 2 Normative references ..1 3 Terms and definitions .1 4 Precautions .3 4.1 General .3 4.2 Ship's condition during calibration .3 4.3 Tank distortion. ..3 4.4 Comparison with drawings .4 4.5 Measurements by measuring tape 4 4.6 Measurements by electro-optical distance-ranging (EODR) instrument. .4 4.7 Conditionofmembrane ..5 4.8 Safety precautions for work in membrane tanks ..5 5 Equipment. ..5 6 Determination of measuring points ..6 7 Calibration by manual method ..6 7.1 General .6 7.2 Tank length measurement ..7 7.3 Tank width measurement. .9 7.4 Tank height measurement ..12 7.5 Measurement of bottom undulation and gauge reference height .14 7.6 Correction for temperature .15 Calibration by electro-optical distance-ranging (EODR) method .16 8.1 General .16 8.2 Setting up of EODR instrument .16 8.3 Calibration procedure ..17 9 Additional measurements .19 9.1 Location of level gauge ..19 9.2 Deadwood. ..19 10 Calculation .19 10.1 General .19 10.2 Calculation of tank volume 20 10.3 Effect of bottom undulation .20 10.4 Areaofchamferportion 20 10.5 Trim corrections .21 10.6 List corrections. 21 10.7 Combined trim and list corrections 21 10.8 Correction for tank shell expansion or contraction 21 11 Report and tables. .22 12 Recalibration .23 Annex A (informative) Uncertainty associated with tank calibration .24 Annex B (informative) Example of tank capacity table (Tank No.3) .36 Annex C (informative) Example of trim correction table (Tank No. 1) ..38 Annex D (informative) Example of list correction table (Tank No. 1) ..40 Bibliography ..42 iii ense with ISt ed without license from IHS Not for Resale

.pdf文档 ISO 8311 2013 Refrigerated hydrocarbon and non-petroleum based liquefied gaseous fuels — Calibration of membrane tanks and independent prismatic tanks in ships — Manual and internal

文档预览
中文文档 51 页 50 下载 1000 浏览 0 评论 309 收藏 3.0分
温馨提示:本文档共51页,可预览 3 页,如浏览全部内容或当前文档出现乱码,可开通会员下载原始文档
ISO 8311 2013 Refrigerated hydrocarbon and non-petroleum based liquefied gaseous fuels — Calibration of membrane tanks and independent prismatic tanks in ships — Manual and internal 第 1 页 ISO 8311 2013 Refrigerated hydrocarbon and non-petroleum based liquefied gaseous fuels — Calibration of membrane tanks and independent prismatic tanks in ships — Manual and internal 第 2 页 ISO 8311 2013 Refrigerated hydrocarbon and non-petroleum based liquefied gaseous fuels — Calibration of membrane tanks and independent prismatic tanks in ships — Manual and internal 第 3 页
下载文档到电脑,方便使用
本文档由 人生无常 于 2024-08-25 23:39:53上传分享
站内资源均来自网友分享或网络收集整理,若无意中侵犯到您的权利,敬请联系我们微信(点击查看客服),我们将及时删除相关资源。