说明:收录全球国际标准 提供单次或批量下载
ISO INTERNATIONAL STANDARD 3008-3 First edition 2016-05-01 Fire resistance tests - Part 3: Door and shutter assemblies horizontally oriented Essais de résistance au feu - Partie 3: Assemblages de portes et volets orientés horizontalement Reference number AX IS0 3008-3:2016(E) ISO International Organization for Standardization =ZHEJIANG INST OF STANDARDIZATION C1 5956617 @IS02016 itted without license from IHS IS0 3008-3:2016(E) COPYRIGHTPROTECTEDDOCUMENT Is02016,PublishedinSwitzerland All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form written permission. Permission can be requested from either ISO at the address below or ISO's member body in the country of the requester. ISOcopyrightoffice Ch. de Blandonnet 8 . CP 401 CH-1214 Vernier, Geneva, Switzerland Tel. +41 22 749 01 11 Fax +41 22 749 09 47 [email protected] www.iso.org Internatinair PrganizationforStandardization ensee-ZHEJIANG INST.OF STANDARDIzARoISQ16- All rights reserved Not for Resale, 2016/7/20 08:15:38 etworking permitted without license from IHS IS0 3008-3:2016(E) Contents Page Foreword ..V Introduction. ...vi 1 Scope. 2 Normative references 3 Terms and definitions 4 Test equipment. 5 Test conditions. ..2 6 Test specimen. ..2 6.1 Size of specimen .2 6.2 Design of specimen. .2 6.3 Verification .3 7 Installation of test specimen .3 7.1 .3 General 7.2 Supporting construction. 3 7.3 Test construction... .3 7.3.1 Associated and supporting construction .3 7.3.2 Associated construction ..4 7.3.3 Supporting construction 4 7.4 Gaps.. .4 8 Conditioning ..4 8.1 Moisture content. 4 8.2 Mechanical ..4 9 Application of instrumentation ..4 9.1 Temperature measurements. 4 9.1.1 Furnace temperature measuring instrument ..4 9.1.2 Unexposed face thermocouples. .5 9.2 Maximum temperature. .6 9.3 Pressure measurements ..6 9.4 Heat flux measurement .6 9.4.1 General. ..6 9.4.2 Apparatus. .7 9.4.3 Procedure. 9.4.4 Measurement. 9.5 Loading. ..8 9.6 Deflection. ..8 10 Test procedure. ..8 10.1 Gap measurements. .9 10.2 Test Measurements .9 11 Performance criteria ..9 11.1 Integrity .9 11.2 Insulation .9 11.3 Loadbearing capacity .9 12 Test report. .10 13 Field of direct application of test results ..10 13.1 General ..10 13.2 Timber constructions .11 13.3 Steel constructions... .11 13.4 Glazed constructions .11 13.5 Fixings/hardware.. 11 Intematinal oganzation @stS2016 - All rights reserved iii ISee=ZHEJIANG INST OF STANDARDIZATION C1 5956617 withoutlicense from IHS

.pdf文档 ISO 3008-3 2016 Fire resistance tests — Part 3 Door and shutter assemblies horizontally oriented

文档预览
中文文档 22 页 50 下载 1000 浏览 0 评论 309 收藏 3.0分
温馨提示:本文档共22页,可预览 3 页,如浏览全部内容或当前文档出现乱码,可开通会员下载原始文档
ISO 3008-3 2016 Fire resistance tests — Part 3  Door and shutter assemblies horizontally oriented 第 1 页 ISO 3008-3 2016 Fire resistance tests — Part 3  Door and shutter assemblies horizontally oriented 第 2 页 ISO 3008-3 2016 Fire resistance tests — Part 3  Door and shutter assemblies horizontally oriented 第 3 页
下载文档到电脑,方便使用
本文档由 人生无常 于 2024-08-25 20:55:02上传分享
友情链接
站内资源均来自网友分享或网络收集整理,若无意中侵犯到您的权利,敬请联系我们微信(点击查看客服),我们将及时删除相关资源。