ISO INTERNATIONAL STANDARD 3008-2 Second edition 2017-05 Fire-resistance tests - Part 2: Lift landing door assemblies Essaisderésistanceaufeu- Partie2:Assemblage deportepaliered'ascenseur Reference number IS0 3008-2:2017(E) Intemational Organization for Standardization @IS02017 =ZHEJIANG INSTOFSTANDARDIZATION C15956617 Not for Resale, 2017/8/21 02:34:5 No reproduction or r networking permitted without license from IHS IS03008-2:2017(E) COPYRIGHTPROTECTEDDOCUMENT IS02017,Published inSwitzerland All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below or ISO's member body in the country of the requester. ISOcopyrightoffice Ch. de Blandonnet 8. CP 401 CH-1214 Vernier, Geneva, Switzerland Tel. +41 22 749 01 11 Fax +4122 749 09 47 [email protected] www.iso.org Intemationaibr PrganizationforStandardization Uicensee-ZHEJIANG INST OF STANDARDIZoISQ 3q,7 -All rights reserved networking permited without license from IHS NotforResale, 2017/8/21 02:34:51 IS03008-2:2017(E) Contents Page Foreword ..V Introduction.. ..vi 1 Scope 2 Normative references 3 Terms and definitions 4 Test equipment. ..2 5 Test conditions. .2 6 Test specimen. .3 6.1 Size of specimen .3 6.2 Number of specimens .3 6.3 Supporting construction .3 6.4 Installation ofspecimen. ..3 7 Conditioning. .5 8 Clearances ..5 9 Functionalitytest. .5 10 Applicationofinstrumentation .5 10.1 Temperature measurements. .5 10.1.1 Furnace-temperature measurement instrument 5 10.1.2 Gas temperature measurement. .5.5 10.1.3 Unexposed-facetemperature measurement 10.1.4 Position ofthe thermocouples todeterminethemaximum temperature .6 10.2 Pressuremeasurements .7 10.2.1 Furnace pressure measurement. .7 10.2.2 Gas flow pressure measurement. .7 10.3 Gas flow measurement 7 10.4 CO2 concentration .7 10.4.1 Furnace. .7 10.4.2 Gasflow .7 10.5 Heat-flux measurement .7 10.6 Deflection .7 11 Test procedure. ..7 11.1 Gap measurements. 1 11.2 Functionality test .11 11.3 Flowmeasurementverification ..12 11.4 Firetest ..12 12 Performance criteria. .12 12.1 Integrity (E) ..12 12.2 Insulation() ..12 12.3 Radiation (W) ..12 13 Termination of test ..12 14 Test report ..13 15 Field of direct application of test results .13 16 Classificationprocedure and declaration ofperformance ..13 16.1 Classification periods. .13 16.2 Declaration of performance. ..14 16.3 Classification periods ..14 Annex A (normative) Description of the canopy and measuring system .15 ntemaional oganzatin@S217-All rights reserved iii LicenSee=ZHEJIANG INST OF STANDARDIZATION C1 5956617 withoutlicense from IHS Not for Resale, 2017/8/21 02:34:51
ISO 3008-2 2017 Fire-resistance tests — Part 2 Lift landing door assemblies