ISO INTERNATIONAL STANDARD 10784-1 First edition 2011-12-01 Space systems - Early operations - Part 1: Spacecraft initialization and commissioning Systemes spatiaux-Opérations initiales- Partie 1: Initialisation et prise en mains du vehicule spatial Reference number ISO 10784-1:2011(E) @ ISO 2011 E"eqr{tkijvgf'd("WPG."E1"1gpqxc."8l"4 :226"Ocftkf."Urckpcn'tki] 9<38"WVE"4246 ISO 10784-1:2011(E) COPYRIGHTPROTECTEDDOCUMENT ? ISO2011 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or ISO's member body in the country of the requester. ISO copyright office Case postale 56 · CH-1211 Geneva 20 Tel. + 41 22 749 01 11 Fax + 41 22 749 09 47 E-mail
[email protected] Web www.iso.org Published in Switzerland ii E*eqr(tkijvgf'd["WPG."E1"1gpqxc.8r4:226"Octf.'Urckp"cm"tkijw/.tgugtxgf"Ygf"Hgd’36*2439-38"WVE"4246 @IsO2011-All rightsreserved ISO 10784-1:2011(E) Contents Page Foreword .iv Introduction 1 Scope. 2 Normative references 3 Terms, definitions and abbreviated terms.. 3.1 Terms and definitions... 3.2 Abbreviatedterms.. 4 Introduction clause of an initialization plan or commissioning report. 4.1 4.2 Overall sequence of initialization events. 4.3 Overall relations of commissioning functions 2 4.4 Orbital-debris considerations in spacecraft initialization and commissioning 5 Objectives of spacecraft initialization and commissioning.. 3 5.1 General.... 3 5.2 Spacecraftinitializationand commissioningstrategymatrix.. .3 6 Spacecraft configuration for spacecraft initialization and commissioning 5 6.1 General..... 5 6.2 Identification and general configuration. 5 6.3 Deviations from the planned configuration. 5 6.4 Functional configuration. 5 7 Spacecraft initialization plan 5 7.1 General. 7.2 Spacecraft configuration. 6 7.3 Initialization constraints and limitations 6 8 Spacecraft commissioning report 6 8.1 General 8.2 Approach and methodology.. 8.3 Eventflow. 8.4 Supporting analyses... 8.5 Input parameters, tolerances, and limits 8.6 Instrumentation. 8.7 Success criteria. 8.8 Evaluation of results 8.9 Deviations 8.10 Conclusion Bibliography ii wintInfl
ISO 10784-1 2011 Space systems — Early operations — Part 1 Spacecraft initialization and commissioning
文档预览
中文文档
16 页
50 下载
1000 浏览
0 评论
309 收藏
3.0分
温馨提示:本文档共16页,可预览 3 页,如浏览全部内容或当前文档出现乱码,可开通会员下载原始文档
本文档由 人生无常 于 2024-08-31 09:23:03上传分享